Rapid RH Common Questions – Part 2 of 4
This video is the second of four videos where Jason Spangler answers questions associated with the Rapid RH and common questions regarding concrete moisture measurement.
The Rapid RH® 4.0 has been replaced with the Rapid RH® L6.
Questions answered in this video:
- How can a 9 month slab still be at 95% RH?
 - Does the HVAC have to be on to have accurate conditions?
 - Do we have to have those conditions documented?
 - How do I get the concrete to dry faster?
 
Take a look at our other three videos that answer questions that address relative humidity testing in concrete.